There are approximately 110 drawings and design documents including:
Energy Yield Calculations, Electrical Engineering, Structural Engineering, and Civil Engineering
There are approximately 25 different packages including – Modules, Inverters, Mounting Structures, Cables, Transformers, HV & LV Panels, Electrical, Civil & Transmission Line Contractors etc.
The Contractor appointed to execute the
plant in a specific schedule often using
multiple groups of labor and specialized
machinery including ramming machines, loaders, cranes.The total number from 100 to 500 labor depending on the size of the plant and execution time.
Benban, Aswan
This is the largest solar park in the world with a size of 1800 MW of which the group owns 115 Mw AC